The day
From about 09:00 on Monday 28 April 2025, voltage on the Spanish grid began to vary more than usual. Just after midday, two oscillations ran through the system: a local one between 12:03 and 12:08, and a wider one between Iberia and the rest of Europe between 12:19 and 12:22. Grid operators damped them by cutting exports to France, coupling lines in southern Spain and changing how the France–Spain direct-current link was run. Each of those steps raised voltage.
At 12:32 voltage started to climb quickly. From 12:32:57 power plants in Spain began disconnecting to protect themselves from overvoltage: a transformer near Granada (355 MW), solar plants near Badajoz (about 727 MW), then 928 MW in Segovia, Huelva, Badajoz, Seville and Cáceres. By 12:33:18 Spain had lost more than 2.5 GW. Each loss reduced the system’s ability to absorb voltage, so voltage rose further. At 12:33:19 the Iberian system began to lose synchronism with the rest of Europe; the Morocco link tripped a second later, and the lines to France a second after that. Load shedding and defence plans activated as designed but could not stop the collapse.
The Spanish government’s early figure was larger: 15 GW lost in about five seconds, around 60 per cent of demand. The two numbers measure different things; the panel’s figure covers losses before the collapse began.
The impact
Trains and metros stopped across both countries. Spanish authorities said about 35,000 rail passengers had to be rescued, and hospitals in Madrid and Catalonia ran on generators. In Lisbon, where clocks are an hour behind, it was 11:33. The Spanish news agency EFE reported at least five deaths possibly linked to the blackout; there is still no official final toll.
Bringing power back
Power returned first through France (Hernani, 12:43) and Morocco (13:04), with hydroelectric and other black-start plants energising parts of the grid. All Spanish nuclear plants had external power by 15:07. Portugal’s two black-start plants had start-up problems, and Portugal was restored mainly through its links with Spain. Its transmission grid was restored at 00:22 on 29 April; Spain’s at about 04:00. By 07:00, 99.95 per cent of Spain’s demand had returned.
What the investigation found
ENTSO-E, the association of Europe’s transmission operators, convened a panel of 49 experts. Its final report, published on 20 March 2026, calls the event “the most severe and unprecedented blackout that had occurred in Europe in the past 20 years”.
The panel lists contributing factors “in no specific order of importance”, including:
- shunt reactors, which absorb excess voltage, were switched manually;
- renewable plants were operating at a fixed power factor under the rules then in force, “thereby not contributing effectively to the voltage control of the system”;
- several conventional plants reached their reactive-power targets in “less than 75 % of the samples (per hour)”, and there were no economic consequences for falling short;
- Spain operated its 400 kV grid up to 435 kV, leaving little or no margin before generators may disconnect;
- many overvoltage protection settings “diverged from applicable requirements or were not aligned with system needs”.
Its simulations show that “increased reactive power margins could have prevented system collapse”. They also show that “neither these measures nor additional inertia would have been sufficient” — an answer to early claims that a lack of spinning conventional generation was to blame. The report finds the blackout “originated in Spain, not in Portugal”.
The report also says it “is not intended to assign liability or responsibility to any party”.
Who is to blame?
The Spanish government. A government committee concluded in June 2025 that voltage-control capacity was insufficient: Red Eléctrica, the grid operator, scheduled too few synchronous plants the day before, and some plants paid to control voltage did not do so. It found no evidence of a cyberattack. In January 2026 the Audiencia Nacional closed its sabotage investigation, finding no “mínimo indicio” (minimum indication) of terrorist sabotage.
Red Eléctrica. The operator says the incident “was caused by a series of cumulative circumstances that far exceeded the N-1 safety criterion”, and blames disconnections it considers incorrect. After the final report, it said the report showed no breach attributable to it. Beatriz Corredor, chair of its parent company Redeia, said: “Red Eléctrica did not fail.”
The utilities. Their association, Aelec, blamed “poor management” by Red Eléctrica.
The panel’s position. It found that the voltage requirements had been “interpreted differently by two generators, the TSO, and the NRA” — two companies, the grid operator and the regulator — and followed the regulator’s interpretation.
Portugal. Prime Minister Luís Montenegro said on the day: “Sabemos que a origem não foi em Portugal” (“We know the origin was not in Portugal”). The regulator ERSE classed the blackout as an exceptional event originating in Spain.
Nuclear and renewables. Opposition politicians blamed government energy policy. Prime Minister Pedro Sánchez rejected any link to a lack of nuclear power.
What has changed
- Reinforced operation: since the blackout, Red Eléctrica has run more conventional plants for voltage control. It put the cost at €783 million by September 2026, with no end date.
- New rules: Spain’s voltage-control procedure (PO 7.4) was revised to let renewables control voltage, and on 10 July 2026 the CNMC increased the incentives for doing so. Royal Decree 997/2025 added compliance reporting and other measures.
- Portugal: the government announced 31 measures worth about €400 million, including doubling its black-start plants from two to four.
- Sanctions: in April 2026 the CNMC opened proceedings against Red Eléctrica for a possible “very serious” infringement and against 19 power plants; 46 more cases followed by 13 May, not all directly linked to the blackout. The regulator said opening the cases does not by itself attribute the cause. As of 25 November 2026, all are still open and no fines have been imposed.
Sources and references
- ReportENTSO-E Expert Panel, Grid Incident in Spain and Portugal on 28 April 2025 – Final Report, 20 March 2026 (pp. 2, 6, 9–28, 304, 364–376, 428, 454) Link
- ReportENTSO-E press release, 20 March 2026 Link
- Primary documentMinistry for the Ecological Transition (MITECO), press release on the government committee’s report, 17 June 2025 Link
- ReportAP via NBC News, 17 June 2025 Link
- ReportRed Eléctrica, 18 June 2025 Link
- ReportRed Eléctrica, response to the incident of 28 April Link
- ReportRed Eléctrica, 20 March 2026 Link
- ReportRedeia, 13 May 2026 Link
- ReportAra (English edition), 23 June 2025 Link
- ReportRTÉ, 29 April 2025 Link
- ReportAP via Yahoo News, 29 April 2025 Link
- ReportEFE via Primicias, 29 April 2025 Link
- Primary documentGovernment of Portugal, 28 April 2025 Link
- ReportERSE, classification of the 28 April 2025 blackout, May 2026 Link
- ReportLegal Today (Europa Press), 12 January 2026 Link
- ReportCNMC, recommendations report, March 2026 Link
- ReportCNMC, 17 April 2026 Link
- ReportCNMC, 24 April 2026 Link
- ReportCNMC, register of sanction proceedings in progress (checked 25 November 2026) Link
- ReportCNMC, 10 July 2026 Link
- ReportBOE, Royal Decree 997/2025 Link
- ReportESS News, 29 July 2025 Link
- ReportelDiario.es, 14 September 2026 Link
- ReportAra (English edition), 30 April 2025 Link
Sources and references are provided for transparency and further reading. Allegations and claims are attributed to their respective sources. Triple Frontiers distinguishes reported allegations from independently established facts.
- Duration
- 10:42
- Released
- 24 Nov 2026
- Directed by
- Triple Frontiers Documentary Unit
- Produced by
- Triple Frontiers
- Reporting
- By Documentary Unit
- Subtitles
- English captions (on YouTube)
- Advisory
- Mentions deaths possibly linked to the blackout (provisional figures).